Deal pier pump repair - thumbnail

Deal Pier stretches 313 meters out in to the English channel.
Situated at the end of the Pier is a lovely little Restaurant (highly recommended) with toilet facilities (hence the reason for our visit!)

Underneath the restaurant there is a very small building which houses 2 Mono pumps.
These are responsible for pumping waste water from the end of the Pier back to main drainage system.
The pumps work on a duty / standby system so, in the event of a pump failure the other pump can carry on the work whilst a repair is undertaken.

This particular pump was removed and completely overhauled at our Bethersden workshop before being reinstated. If you need helps with a pump please do give us a call.