leisure centre new pumps refit

Replacing old obsolete pumps, especially when the modern alternatives are not a direct fit can be awkward to say the least.

These 3 pumps were located about 8 feet below ground level and mounted on a concrete plinth.
The first job was to remove the plastic pipework to allow us to remove the old units.
New bases were made so that the new pumps would meet the suction side of the remaining pipework, the new 11Kw Lowara pumps could then be fitted into place.
New plastic pipework was then made to suit.

The pumps themselves are fully controlled by 3 of our energy saving TEC Drive IP66 stand alone inverters.